ToolT5

Delivery and retirement plan

Views: Readiness and capability gap heatmap · Build buy configure or integrate · Role and team design card · Delivery retirement and scorecard template

Turn the selected intervention into a maintained service or a closed experiment.

Interpretation: Dates are review windows; they cannot mature outcomes faster.

Use these five templates to keep a record of the work. Each template has views for different tasks; they do not require separate systems or registers. Copy the fields your Play needs and link the records with one intervention ID. Record the owner, version and review date. Leave missing information explicit: a blank field does not mean approval.

Readiness and capability gap heatmap

Target Play and configuration: Basic / Connected / Advanced
Dimension | Current evidence | Required for Play | Gap type | Owner | Next action
Strategy and customer understanding:
Economics and outcome linkage:
Data, identity and permission:
Measurement and experimentation:
Acquisition, activation or lifecycle execution:
Automation and optional AI:
Operating model, authority and reviewer capacity:
Governance, reliability and recovery:
Skills, adoption and learning:
Funding, support and retirement:
Gap types: Blocking / Value limiting / Scale limiting / Optional

Use colours only as a visual aid to these explicit labels. No overall maturity score. “Advanced” requires evidence for the chosen capability, not a high score elsewhere. When this view feeds D02, complete the versioned fixed prerequisite set for the selected Play/configuration. Do not omit or downgrade a blocking condition such as current permission; supplemental gap rows add detail without replacing source requirements.

Build buy configure or integrate

Compare existing/manual, configure native, buy missing capability, integrate lightly and build the residual gap. For each option record differentiation, data fit, delivery speed, vendor maturity, integration, total cost, control, portability and maintenance. Add permission boundaries, actual licensed capability, exit and support.

Required decision and acceptance task:
Option | Meets task? | Native proof | Gaps | Five-year cost | Owner | Exit
Existing/manual:
Configure native:
Buy missing capability:
Integrate existing capabilities:
Build documented residual gap:
Chosen option: Buy / Configure / Integrate / Build (or keep existing/manual)
Why simpler options fail the acceptance task or economics:
What would reverse the decision?

For centralisation, share standards, scarce methods and cross-team controls where useful; embed customer context and local execution. Require measured recurring coordination demand before a new shared team. For real time, state the valuable latency requirement and test native event handling first. For personalisation, require meaningful need differences, available treatments and net benefit above variant maintenance. These are option tests within T5, not new architecture frameworks.

Role and team design card

Accountability, not proposed title:
Purpose / outcomes / decisions and actual authority:
Human judgement and relationship work:
AI-assisted work / automated work / external support:
Skills demonstrated in real tasks:
Volume, allocated time, cover and specialist bottlenecks:
Metrics: commercial, quality, reliability and burden:
Existing work that stops or transfers:
Dedicated role or persistent team justified? Evidence and funding:

Delivery retirement and scorecard template

Phase / selected outcome / accountable owner / review date:
Prerequisites and named gate evidence:
Actions, dependencies, staff-days and cost by existing role:
Available capacity and competing commitments:
Work displaced; specialist and review bottlenecks:
Measurement: contribution, customer, accepted-work cost, evidence, reliability:
Decision gate: Continue / Fix first / Stop; predeclared local thresholds:
Support owner, absence cover, maintenance and vendor-change review:
Old process/tool/report/meeting to retire, date and closure owner:
Replacement acceptance and fallback before retirement:
Records/export/retention, access removal and contract action:
Actual cash or capacity realisation and Finance verification:

60-minute planning workshop: Confirm the Play and blocking gaps; allocate actual capacity; test the smallest implementation option; set the next gate; name one retirement. If no work can stop and no capacity can be added, reduce scope. A deep assessment is warranted for customer-impacting automation or material platform investment; it uses system tests, quotes and operational evidence.

Evidence for this tool4claims reviewed, with confidence ratings, limits and sources.

Claim classifications

Accepted means a principle or mechanism survived critical review, not that it guarantees a return. Accepted with conditions means prerequisites apply. Qualified means the original claim has been narrowed. Advanced needs substantial readiness. Experimental needs a capped comparison. Unresolved means the evidence cannot settle the claim. Rejected means the recommendation is excluded.

High, Medium and Low describe confidence in the stated target, not the chance of a positive ROI. For a Qualified or Rejected historical claim, confidence applies to the decision to narrow or reject it and to the supported limit—not to the original headline. Read the headline and classification together. An accounting identity or design principle is not empirical evidence of a commercial outcome. Follow the linked chapters, Plays and tools to see where each claim applies.